Demand Connection Network Code
Commission Regulation (EU) 2016/1388 established a network code on demand connection to the grid.
What is this Network Code?
The Network Code Demand Connection Code is one of three Connection Codes which form part of the European Network Codes. It provides a framework for facilitating the integration of DCC connections to the grid. DCC came into force on 7 September 2016.
Proposals and consultations
Consultations are held before the submission of proposed new local, regional and European rules. Below shows local consultations in Northern Ireland on the HVDC Network Code. For European and regional consultations, visit the ENTSO-E consultation hub.
Parameter Selection for Demand Connection Code (DCC)
As part of implementing this Network Code, we had to submit a proposal for requirements to apply it in Northern Ireland.